Complex Roof? Watch Us Roll Form Standing Seam On Site
This is the Reel we ran in September. It opens over a roof with more hips and valleys than straight runs, with the crew already on it, and then shows what makes that kind of roof workable: the roll former parked in the driveway, turning coil into standing seam panels cut to the exact length each run needs.
That is the whole idea behind on-site roll forming. Long, continuous panels formed where they are installed mean fewer seams, less waste from trimming, and no long panels bent or scratched on a truck between shop and job. On a complex roof, fewer seams matters most in the valleys, where every joint is a place water can find. And because panels are made as needed, the crew is not waiting on a delivery: Onsite! in as few as 5 days.
The full write-up is here: Standing Seam on Complex Roofs: Why We Roll Form On-Site. Have a roof like this one? Call or text Adam at 612-518-8599 and he will walk you through panel profile, trim and lengths.